Inner-Mongolia Testing Site

Author:SAWT      Update Time:2012/8/16      Hits:486

1. Description

The system is installed in a turbine testing site in Inner-Mongolia. The system is composed of a 5kW wind turbine, a 5kW off-grid heating controller and a 9kW heating elements. The system is tested in low wind, medium wind, high wind speed, and also in low temperature, heavy snow, and sandy condition. The system is efficient, and is able to achieve over speed control and braking in heavy winds. It completely meets the design requirements. It was installed in August 2012.

 

2. System Diagram


3. System Configuration

Parts List

Quantity

5kW wind turbine

1

5kW off-grid heating controller

1

9kW heating elements

1

5.5m tower

1

Remote monitoring system

1

 

4. Photo


5. Testing Data



Real time monitoring at

http://724ps.mmzzxx.com/login.php Username sawt001

Video link at

http://v.youku.com/v_show/id_XNjgxODU3ODk2.html