Telecom Base in German

Author:SAWT      Update Time:2011/3/16      Hits:354

1. Description

This project is carried out to test the feasibility of installing vertical axis wind turbines on existing telecom towers. It was installed in March 2011.


2. System Diagram




3. System Configuration


Parts List

Quantity

3kW wind turbine

1

3kW on-grid controller

1

3.6kw on-grid inverter

1

Telecom tower

1


4. Photo