Home > Projects > Case Studies■ Case Studies
Farm in Australia Read More

The on-grid wind generation system is mainly composed of a wind turbine, an on-grid controller, an on-grid inverter and a tower. The system is installed in an Australian farm for grid connection.

Roof installation on the annex buildings of the Shanghai World Financial Center Read More

The off-grid system is installed on the roof of the annex buildings of the Shanghai World Financial Center. It is composed of a 1kW wind turbine, a group of 3kW solar panels

BTS in Tajikistan Read More

The system is installed on a high mountain, composed of a 5kW wind turbine, 10kW solar panels, a 5kW wind off-grid controller, a 10kW solar controller, 48V/2000AH battery bank and a 20kW standby diese

Hybrid Street Light in Michigan Read More

The system is installed by the entrance of a park, composed of a 1kW wind turbine, 160W solar panels, a 1kW wind on-grid controller, a 1kW wind on-grid inverter, a 250W solar on-grid inverter and a 80

India Pavilion, 2010 Shanghai World Expo Read More

The system, installed in India Pavilion, 2010 Shanghai World Expo, consists of a 3kW wind turbine, 3kW solar panels, a 3kW off-grid wind controller, a 2kW off-grid inverter, and 48V/1000Ah batteries.

German community Read More

The on-grid system is located in a German community. The system consists of a 3kW wind turbine, 3kW solar panels, a 3kW wind controller, a 3kW on-grid wind inverter and a 3kW on-grid wind inverter.

Roof installation on S. Dakota Government Building Read More

Capitol lake plaza was purchased by South Dakota government (and currently is occupied by South Dakota Department of Tourism). In a renovation, 2 units of 3kW turbines are installed on the roof.

Inner-Mongolia Testing Site Read More

The system is installed in a turbine testing site in Inner-Mongolia. The system is composed of a 5kW wind turbine, a 5kW off-grid heating controller and a 9kW heating elements.

Telecom Base in German Read More

This project is carried out to test the feasibility of installing vertical axis wind turbines on existing telecom towers. It was installed in March 2011.


First Page   Previous   Next   End   Page:1/1  9   10/Page    TO: